[1]
Rozi Mexiwel, B. Tulung Prayoga, and L. D. Setyana, “Evaluation of Additional Emergency Brake Button Installation to Reduce Risk Priority Number (RPN) for Main Emergency Brake Failure in a 350 HP Drawworks Rig”, KESANS, vol. 5, no. 10, pp. 1892–1906, Jul. 2026.