Rozi Mexiwel, Tulung Prayoga, B. and Setyana, L. D. (2026) “Evaluation of Additional Emergency Brake Button Installation to Reduce Risk Priority Number (RPN) for Main Emergency Brake Failure in a 350 HP Drawworks Rig”, KESANS : International Journal of Health and Science, 5(10), pp. 1892–1906. doi: 10.54543/kesans.v5i10.680.