Safety Maturity Level Improvement Program At PT XYZ A Mineral (Nickel) Mining Company In Central Sulawesi

Authors

  • Faisal Reza Master of Applied Occupational Safety and Health Study Program, Faculty of Vocational Universitas Gadjah Mada, Indonesia, Indonesia
  • Rochim Bakti Cahyono Departemen of Health Service and Information, Vocational School, Universitas Gadjah Mada, Indonesia, Indonesia
  • Benidiktus Tulung Prayago Departemen of Health Service and Information, Vocational School, Universitas Gadjah Mada, Indonesia, Indonesia
  • Muhammad Arrofiq Departemen of Health Service and Information, Vocational School, Universitas Gadjah Mada, Indonesia, Indonesia

DOI:

https://doi.org/10.54543/kesans.v5i7.627

Keywords:

Safety Culture, Mining Industry, Nickel, Safety Maturity Level, SMKP

Abstract

Introduction: The nickel mining industry has high operational risks, thus requiring a mature safety management system. Objective: This study aims to analyze the Safety Maturity Level (SML) in nickel mineral mining operations at PT XYZ based on the parameters in the Decree of the Director General of Mineral and Coal No. 10.K/MB.01/DJB.T/2023. This evaluation is important to identify standard deviations and formulate a program for continuous improvement of safety culture. Methods: This study uses a qualitative and quantitative research design (mixed methods) by assessing four main indicators: worker participation, unit leader responsibility, accident statistical analysis, and risk control efforts. The research instruments include an assessment rubric according to ESDM regulations, in-depth interviews, field observations, and Focus Group Discussions (FGD). Results and Discussion: PT XYZ achieved a total safety performance score of 0.65 out of 1.00, placing the company at the "Reactive" level. Safety is still regarded as an administrative formality rather than an internalized work culture. Conclusion: To advance toward the "Proactive" level, strategic programs are proposed, including optimization of the "SLAMET" digital application, Management Walk Thru, and Advanced Data Analytics for accident investigation

Downloads

Published

2026-04-28

How to Cite

Reza, F., Cahyono, R. B., Prayago, B. T., & Arrofiq, M. (2026). Safety Maturity Level Improvement Program At PT XYZ A Mineral (Nickel) Mining Company In Central Sulawesi. KESANS : International Journal of Health and Science, 5(7), 1332–1342. https://doi.org/10.54543/kesans.v5i7.627

Citation Check

Similar Articles

<< < 6 7 8 9 10 11 12 13 14 15 > >> 

You may also start an advanced similarity search for this article.